Mijas Marina

We have the pleasure to inform all our Web page visitors that the advance of the General Plan Urban Ordination of Mijas (in our case the sport port) has been approved in August of 2005. This news not only is important for all the work carried out during these years but also for the definitive project, which is the Marina Mijas port’s construction.



Mijas, as you know, is one of the town halls that today in a day follows a plan of impressive urbanistic development due to its leadership in the tourist market and residential tourism.

In this panorama, arises the idea of this project from a study made by the Mijas’s Townhall confirming that in this develop project is urgent the need of a sports port in the municipalities of Mijas. Nonsingle by the necessity but also by the increasing demand of pears positions.


This is, without any doubt, the complement that Mijas needs to be able to compete by the high standing tourism and with its local competitors, as we can prove in Marbella, Fuengirola, or Benalmadena, all are extending their ports due to the great existing demand of pears positions. The competition by the tourist market is hard and competitive every time, reason why this infrastructure is of extreme interest to give Mijas the incentive that needs.

The future sports port idea presentation and general study immediately was approved unanimously by Mijas’s Local Government Commission and also counting with the unconditional support of the City Council in all the managements, as much in the Department of Seaports of Junta de Andalucia and in Costas Ministerio de Obras Publicas.

THE PROJECT CONSISTS OF:

1. Amount of berths:

a) 800 to 1000 berths with lengths from 5m to 100m.
b) 2 dockages for cruises/transatlantic.
c) Helicopters landing area.

2. Berths for fishing boats from 30 to 50 with its market, refrigerators and all the services.

3. One or two hotels depending on the demand..

4. Commercial stores, bars, coffee shops, discothèques.

5. Nautical club / Administrative Services.

6. Dock with all its services.

7. Public parking.
8. Palace of congresses.


MARINA MIJAS SL is the promoter company of the port’s project. This project will be a reference in Spain and also in the world due to the design, which is architectonic, urban and cultural. The motives to choose this futurist design is not only the leisure but also the cultural curiosity of the design and the bet in the modernization and architectonic quality that will place the municipality of Mijas in the worldwide first line and reference. This innovating design is a creation of Barbany’s Architects Study, directed by Gilbert Barbany.

Civilian Builds

The works consist fundamentally of :

- Construction of 760 m of dock in slope.
- Construction of 200 m of seawall.
- Construction of 20.000 m² of enclosures above sea level +2.0, leaned to   contradique.
- Construction / installation of 982 ml of marshland.
- Dredged of 11.500 m³ of the sand bottom in an approximated surface 7.650 m² with an average depth of 1,5 m. - Dredged of 10.000 m³ of the rock bottom in an approximated surface 10.000 m² an average depth of 1 m². In order to provide the sufficient shelter to the inners harbours a shelter dock of 760 m length is designed.